WP4 EDMS

Nb Description Responsible Date out Date in
20 Define and circulate a set of use-cases and for some (or all) his proposed solution. Source, Closed German 7/6/01 15/5/01
21 Go through German’s use-cases and feedback/modify the proposed solutions according to your own view of the architecture. Source, Closed All 7/6/01 15/5/01
22 Clarify if a node has to be declared in the configuration database before it is installed. Closed Installation task (Phil) 7/6/01 15/5/01
23 Better clarification of what FLIDS is. Source, Update-1, Update-2, Closed Gridification task (David) 7/6/01 15/5/01
24 Fix task definition to state that also the JDL is required by the LCAS. Source, Update-1, Closed   7/6/01 15/5/01
25 Provide hooks for fault tolerance sensors within the definition of s/w package. For instance: sendmail running on port 25. Source, Closed Installation task (Phil) 7/6/01 15/5/01
26 Produce plan to advance WP4 architecture work. Source, Update-1, Closed Olof 10/4/01 3/4/01
27 Review draft tools survey circulated by Maite. Source, Closed All 30/4/01 3/4/01
28 Find a project leader for the interim installation system deliverable. Source, Closed Olof & Phil 3/4/01 7/3/01
29 Request WP6 to use the WP4 interim installation system to re-install all testbed nodes at the start-up of testbed 1 in PM9. Source, Closed Olof 9/3/01 7/3/01
30 Produce a draft WP4 architecture to help the milestone planning. Source, Closed Olof 2/4/01 7/3/01
31 Check if WP7 monitoring tools also target LAN. Source, Closed Kors ?/2/01 14/2/01
6 Information providers: complete LSF with missing attributes (WorstTraversalTime, EstimatedTraversalTime). Closed Thomas + Florian 19/9/01 19/9/01
9 CVS to RPM. Closed Maite, Jan, Lionel 19/9/01 19/9/01
15 What type of hardware information has to be stored in the configuration database? Source, closed Installation and fault tolerance tasks (Phil, Lord) 31/8/01 15/5/01
7 Information providers: complete static information attributes (CEId, MinPhysicalmemory, ...). Source, closed Thomas, David 26/9/01 19/9/01
8 Bugzilla: send around proposal for components. Source, closed Maite 26/9/01 19/9/01
10 Send around a proposal for naming conventions. Source, closed Maite 26/9/01 19/9/01
16 Read and comment of the proposal concerning initial installation circulated by the Fault tolerance task before the architecture workshop. Source, closed Installation task (Phil) 26/9/01 15/5/01
32 Fix CVS access for Thomas. Source, closed Maite, Thomas 26/9/01 19/9/01
33 Send lsf information providers to Lyon (Fabio Hernandez). Source, closed Thomas 26/9/01 19/9/01
35 Every deliverable  to provide a name to help Maite with integration during October. Source, closed Phil/Jan, Lionel, Bernd 26/9/01 19/9/01
1 Package & documentation & CVS ready for each prototype. Source, update-1, closed Jan, Lionel, Bernd, Thomas 28/9/01 19/9/01
4 Information providers: make an RPM. Source, closed Thomas + Florian 11/10/01 19/9/01
5 Information providers: complete PBS port. Source, closed Thomas + Florian 11/10/01 19/9/01
11 Architecture: send final subsystem descriptions to German. Should include a glossary. Source, update-1, closed Olof, Phil, Lionel, David, Thomas 11/10/01 19/9/01
12 Architecture: implement reviewers comments in the intro part, integrate the subsystem descriptions and send out for new review. Source, update-1, closed German 11/10/01 19/9/01
38 Review the new architecture paper (D4.2) draft when it is circulated by German today. Deadline for the review is next Wednesday (3/10/2001). Source, closed Olof, Lord, Florian, Michele, David, Lex 11/10/01 26/9/01
2 Integration of base installation & cfg mgmt prototype. Source, closed Lionel + Bernd 24/10/01 19/9/01
44 Check why Lyon testbed doesn't want to use LCFG. Source, closed Olof 24/10/01 11/10/01
45 All tasks should go through the D4.2 reviewers comments on their subsystems and send the changes to German. Source, closed Olof, Piotr, Florian, David, German, Lord 7/11/01 24/10/01
46 All tasks should add a "status section" to their subsystem descriptions in D4.2 according to German's specifications. Source, closed Olof, Piotr, Florian, David, German, Lord 7/11/01 24/10/01
47 Read Bob Jone's "Sw release planning" document and send comments via E-mail to the whole WP4 list. Source, closed All 7/11/01 24/10/01
34 Find new task leader for installation. Source, closed Olof, Maite 21/11/01 19/9/01
39 Gridification and  Resource Mgmt to produce a report on overlaps with Globus.Target for November 27 (Action from Frascati meeting). Source, update-1, update-2, closed Gridification task and Resource Management task 19/12/01 10/10/01
41 Follow up if Condor is needed for NIKHEF testbed for release 1. Source, update-1, update-2, closed David 19/12/01 11/10/01
43 Fix information providers for Globus-2. Source, update-1, closed Thomas, Florian 19/12/01 11/10/01
49 Write a draft global specification for Release-2. Source, update-1, closed Olof, German 19/12/01 7/11/01
50 Review available resources in the partner institutes for next year. Source, closed Olof 19/12/01 7/11/01
51 Initiate and drive the second iteration on the open issues in the architecture. Source, update-1, closed German 19/12/01 7/11/01
52 Provide WP6 with SE, CE and Gatekeeper LCFG default configurations. Source, closed Marco 19/12/01 21/11/01
53 Answer request from German for formal points that should be discussed on Monday. Want feedback before Friday., Source, closed All 19/12/01 21/11/01
37 Thomas to fix a call-out phone for next telephone conferences. Source , update-1, closed Thomas 09/01/02 19/9/01
55

Distribute DataGrid repository guidelines & coding/naming conventions to WP4. Read and send comments to discuss next phone-conference. Source, closed 

Maite, WP4 09/01/02 19/12/01
19 Find out what motherboards (vendor, type, chip-set) are going to be used by the testbeds. The FT task requests this information. Source, update-1, update-2, update-3, closed Frank, Lord 06/02/02 15/5/01
56 Send a mail/written report about LCAS library & modules needed by the new gateway, and if this release will rely on gridmap files.  Source, update-1, update-2, closed David 06/02/02 19/12/01
59 Arrange a phone conference between monitoring and FT tasks next week. Source, closed Olof 06/02/02 23/01/02
62 Clarify if te RMS job-manager for release 1.2  would work with a globus gatekeeper of if it requires the WP4 gatekeeper. Source, closed Thomas, Florian 06/02/02 23/01/02
3 LCFG: decide on RPM list and send it to WP6. Source, update-1, update-2, update-3, update-4, update-5, update-6, closed Jan + Maite 20/02/02 19/9/01
14 Consider section 4.4.2, use-case by the gridification task on host authentication at initial installation, in the architecture document circulated by German before the workshop. Source, update-1, update-2, update-3, update-4, closed Installation task (Phil) 20/02/02 15/5/01
36 Clarify together with Marco Serra (INFN Rome) what has been done for the Globus-LCFG object (for Globus-2) and who works on it. Source, update-1, update-2, update-3, update-4, update-5, update-6, closed Maite 20/02/02 19/9/01
42 Report experience with LCFG. Source, update-1, update-2, update-3, update-4, closed All institutes using LCFG 20/02/02 11/10/01
57 Send the plans & contents for future Edinburgh LCFG releases to German/instqallation mailing list.  Source, update-1, closed Lex 20/02/02 19/12/01
60 Read WP1 proposal for accounting and determine what WP4 wants/can do for release 2 and what could be discussed at a bi-lateral meeting with WP1 in Paris in March. Thomas is main contact with WP1 in this matter. Source, closed David, German, Thomas, Olof   23/01/02
61 Investigate risks with releasing the WP4 gatekeeper in release 1.2 and also report/coordinate this work with the EDG authorization work. Source, update-1, update-2, closed David 06/02/02 23/01/02
65 Put gatekeeper code in CVS. Source, closed Martijn 14/03/02 05/03/02
67 Decide if the RMS task is ready to release their first prototype job manager for R1.2. Source, closed Thomas 20/03/02 05/03/02
63 Try to achieve a WP4-wide decision on what RPC mechanism should be used for new interfaces.  All tasks must investigate SOAP (or other XML RPC) implementation for the different programming languages they intend to use. Florian agreed to collect the input. Source, update-1, update-2, update-3, closed All task leaders   06/02/02
66 Upgrade of the FT CE interfaced with the Monitoring repository. Check with Sylvain how to use the current interface and when to migrate to the new interface. Source, update-1, update-2 , closed Lord 20/03/02 05/03/02
68 Send to Olof and Maite details of the work involved to port the WP4 software to Solaris. The sort of information needed is what are the steps involved, what knowledge of Solaris is required and how much time each task would take. Source, update-1, update-2, closed All task leaders 04/04/02 20/03/02
70 Fill in gridification testplan for release 1.2 (see mail from Maite) closed David, Martijn 17/04/02
48 Write a draft Release 2 subsystem development plan. The plan should follow the template circulated by Olof last week. Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, closed Lionel, Florian, David, Lord, German 29/05/02 7/11/01
54 Port CE information providers to Condor. Source, update-1, update-2, update-3, update-4, update-5, closed Florian, Thomas 29/05/02 21/11/01
71 Follow-up the edg license issue. Source, closed Maite, Olof 29/05/02 08/05/02
64 Organise the meeting with LCFG experts and Markus and Emanuele the week after the Paris week. Source, update-1, update-2, update-3, update-4, closed Maite   20/02/02
72 Summarise the installation task autobuild issues in some detail for Yannick and Maite. Source, closed German 29/05/02
73 Check with Cal when he wants to organize a meeting  about the Globus gatekeeper and job manager problems. Source, closed Maite 29/05/02
75 Invite an LSF expert from CERN to the WP4 workshop. Source, closed Olof 19/06/02 29/05/02
69 All task to comply with autobuild (see mail from Maite) update-1, update-2, update-3, update-4, closed All tasks leaders 17/04/02 31/05/02
77 Provide un updated version of the FT preliminary design and development plan that matches the recent progress reports. Source, closed Frank, Lord 31/07/02 26/06/02
78 Inform Bob that LCFG released in 1.2 will not include the copyright line for release 1.3. Source, closed Olof, Maite 28/06/02 26/06/02
13

Provide written formal requirements to the configuration task:

  • Type of data to be stored
  • Type of queries
  • Use-cases

Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, update-9, update-10, update-11, closed

Task leaders (Olof, Lord, German Florian, David)  30/10/02 15/5/01
80 Fix failing installation step of autobuild for the installation task. Source, update-1, closed German 30/10/02 11/09/02
76 Follow up together with WP1 (Massimo) the definition of the glue-schema for the CE. Deployment of the new schema is planned for release 1.4. Source, update-1, update-2, update-3, update-4, update-5, update-6, closed Thomas 27/11/02 12/06/02
79 Follow up that WP6 takes on the task of defining the RH7.2 distribution for EDG. Source, update-1, update-2, closed Olof 27/11/02 11/09/02
84 Answer Maite’s email about exercises for the WP4 hands-on workshop. Source, update-1, closed Lord, Sylvain, German, Thomas, Martijn, Lionel 08/01/03 30/10/02
85 Check with Francesco (WP1) if the WP4 accounting is needed for their EU review demo. Source, closed Olof 08/01/03 27/11/02
86 Provide input for next quarterly report (4Q02) based on October and November (not December!) by end of this week (29/11/02). Because of the early EU review (4-5th of February 2003) the last Quarterly Report for 2002 will have to be delivered by beginning of December. Olof will send a reminder to the WP4 mailing list. Source, closed All institute representatives 08/01/03 27/11/02
87 Provide update for what has been done to address the reviewers’ comments from the first EU review and the EDG reply, see mail. The update has to be included in the 2002 annual report, which needs to be delivered by first week of December. Source, closed All task leaders: Lord, Olof, German, Thomas, David, Lionel 08/01/03 27/1102
81 Find out if it is possible to define scheduling attributes for the local disk footprint with the Maui scheduler. Source, update-1, closed Thomas 11/09/02
82 Review and comment on the global schema. This should also include a review of what parts of the global schema are of interest for the tasks. Send the review and comments to Maite. Source, update-1, update-2, closed Lord, Sylvain, German, Thomas, Martijn 18/10/02 09/10/02
83 Provide planning for 2003. Source, update-1, update-3, closed Thomas, David 1/12/02 30/10/02
58 Make sure that they have a common and viable solution for the job repository/job manager for release 1.2. Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, update-9, update-10, update-11, update-12, update-13, closed Gridification task & Resource Management task Release 1.2 19/12/01
89

Inform if the RMS to be deployed at J+22 will/will not provide accounting support. closed

Thomas 05/03/03 26/02/03
40 Fabric Monitoring and Fault Tolerance to define interfaces between the different components in the subsystem. Deadline for November WP4 workshop (Action from Frascati meeting). Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, update-9, update-10, update-11, update-12, update-13, update-14, update-15, update-16, update-17, update-18, update-19, update-20, update-21, update-22, closed Fabric Monitoring task and Fault Tolerance task 31/01/02 10/10/01
74 Coordinate the gathering and publication of accounting data. Publication of accounting data to the grid is foreseen for release 2. Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, update-9, closed Thomas 30/09/02 29/05/02
17

Make sure to be able to distinguish between the two cases:

  • Execution of a job fails because of a problem with the node
  • Job execution fails because of the job

The resource management system cannot rely entirely on the monitoring to detect that a node is unusable. There will always be time-windows when something fails and the monitoring detects it (sensors are launched at a certain time frequency). Source, update-1, update-2, Closed

Resource mgmt task (Florian, Thomas)   15/5/01
93 Store latest version of FT mw in cvs, and make it work with autobuild (gcc 3.2.2 compiler). Closed Lord  06/03 13/05/03
88 German will produce a set of use cases for action 17 and Thomas will test them and make a report explaining if they are solved or not for next WP4 conference. Update-1, update-2, update-3, update-4, closed Thomas, German 10/03/03 26/02/03
95 Switch on the RMS at their sites once the release EDG2.0 is deployed so that it can be tested in a real environment. Closed Andrea, David G. & Thomas  06/03 13/05/03
94 Package external interfaces separately according to developers’ guidelines. Update-1, update-2, closed Piotr & task leaders  06/03 13/05/03
92 Make WP4 components work with autobuild gcc3.2.2 Update-1, update-2, update-3, closed WP4 task leaders 02/06/03 23/05/03
96 Follow up the Fabric Monitoring use in the EDG testbed and promote it, e.g. release metric to monitor daemons and wimple web interface to visualize it. Source, update-1, update-2, Closed Sylvain 15/09/03 13/08/03
97 Contact WP3 to check the status of the interfacing to the Fabric Monitoring. Source, update-1, Closed Maite 30/08/03 13/08/03
98 Prepare the 1h tutorial topics and exercices for the EDG conference at Heidelberg and send them to Maite. Source, update-1, update-2, Closed Lord, Jan, Thomas and Martijn 05/09/03 13/08/03
18 Investigate and understand how to interface to LSF, PBS and Condor. Source, update-1, update-2, update-3, update-4, update-5, update-6, update-7, update-8, update-9, update-10, update-11, update-12, update-13, update-14, update-15, update-16, Closed Resource mgmt task (Florian, Thomas)   15/5/01
         
 