| Nb |
Description |
Responsible |
Date out |
Date in |
| 20 |
Define
and circulate a set of use-cases and for some (or all) his proposed
solution. Source,
Closed |
German |
7/6/01 |
15/5/01 |
| 21 |
Go
through German’s use-cases and feedback/modify the proposed solutions
according to your own view of the architecture. Source,
Closed |
All |
7/6/01 |
15/5/01 |
| 22 |
Clarify
if a node has to be declared in the configuration database before it is
installed. Closed |
Installation task (Phil) |
7/6/01 |
15/5/01 |
| 23 |
Better
clarification of what FLIDS is. Source,
Update-1, Update-2,
Closed |
Gridification task (David) |
7/6/01 |
15/5/01 |
| 24 |
Fix
task definition to state that also the JDL is required by the LCAS. Source,
Update-1,
Closed |
|
7/6/01 |
15/5/01 |
| 25 |
Provide
hooks for fault tolerance sensors within the definition of s/w package.
For instance: sendmail running on port 25. Source,
Closed |
Installation task (Phil) |
7/6/01 |
15/5/01 |
| 26 |
Produce
plan to advance WP4 architecture work. Source,
Update-1, Closed |
Olof |
10/4/01 |
3/4/01 |
| 27 |
Review draft tools survey circulated by Maite. Source,
Closed |
All |
30/4/01 |
3/4/01 |
| 28 |
Find a project leader for the interim installation system
deliverable. Source,
Closed |
Olof & Phil |
3/4/01 |
7/3/01 |
| 29 |
Request WP6 to use the WP4 interim installation system to
re-install all testbed nodes at the start-up of testbed 1 in PM9. Source,
Closed |
Olof |
9/3/01 |
7/3/01 |
| 30 |
Produce a draft WP4 architecture to help the milestone
planning. Source, Closed |
Olof |
2/4/01 |
7/3/01 |
| 31 |
Check if WP7 monitoring tools also target LAN. Source,
Closed |
Kors |
?/2/01 |
14/2/01 |
| 6 |
Information providers: complete LSF with missing attributes
(WorstTraversalTime, EstimatedTraversalTime). Closed |
Thomas + Florian |
19/9/01 |
19/9/01 |
| 9 |
CVS to RPM. Closed |
Maite, Jan, Lionel |
19/9/01 |
19/9/01 |
| 15 |
What
type of hardware information has to be stored in the configuration
database? Source,
closed |
Installation and fault tolerance tasks (Phil, Lord) |
31/8/01 |
15/5/01 |
| 7 |
Information providers: complete static information
attributes (CEId, MinPhysicalmemory, ...). Source,
closed |
Thomas, David |
26/9/01 |
19/9/01 |
| 8 |
Bugzilla: send around proposal for components.
Source, closed |
Maite |
26/9/01 |
19/9/01 |
| 10 |
Send around a proposal for naming conventions.
Source, closed |
Maite |
26/9/01 |
19/9/01 |
| 16 |
Read
and comment of the proposal concerning initial installation circulated by
the Fault tolerance task before the architecture workshop. Source,
closed |
Installation task (Phil) |
26/9/01 |
15/5/01 |
| 32 |
Fix CVS access for Thomas. Source,
closed |
Maite, Thomas |
26/9/01 |
19/9/01 |
| 33 |
Send
lsf information providers to Lyon (Fabio Hernandez). Source,
closed |
Thomas |
26/9/01 |
19/9/01 |
| 35 |
Every
deliverable to provide a name to help Maite with integration during
October. Source, closed |
Phil/Jan, Lionel, Bernd |
26/9/01 |
19/9/01 |
| 1 |
Package & documentation & CVS ready for each
prototype. Source, update-1,
closed |
Jan, Lionel, Bernd, Thomas |
28/9/01 |
19/9/01 |
| 4 |
Information providers: make an RPM. Source,
closed |
Thomas + Florian |
11/10/01 |
19/9/01 |
| 5 |
Information providers: complete PBS port. Source,
closed |
Thomas + Florian |
11/10/01 |
19/9/01 |
| 11 |
Architecture: send final subsystem descriptions to German.
Should include a glossary. Source, update-1,
closed |
Olof, Phil, Lionel, David, Thomas |
11/10/01 |
19/9/01 |
| 12 |
Architecture: implement reviewers comments in the intro
part, integrate the subsystem descriptions and send out for new review. Source,
update-1, closed |
German |
11/10/01 |
19/9/01 |
| 38 |
Review the new architecture paper (D4.2)
draft when it is circulated by German today. Deadline for the review is
next Wednesday (3/10/2001). Source,
closed |
Olof, Lord, Florian, Michele, David, Lex |
11/10/01 |
26/9/01 |
| 2 |
Integration of base installation & cfg mgmt prototype.
Source, closed |
Lionel + Bernd |
24/10/01 |
19/9/01 |
| 44 |
Check why Lyon testbed doesn't want to use
LCFG. Source, closed |
Olof |
24/10/01 |
11/10/01 |
| 45 |
All tasks should go through the D4.2
reviewers comments on their subsystems and send the changes to German. Source,
closed |
Olof, Piotr, Florian, David, German, Lord |
7/11/01 |
24/10/01 |
| 46 |
All tasks should add a "status
section" to their subsystem descriptions in D4.2 according to
German's specifications. Source, closed |
Olof, Piotr, Florian, David, German, Lord |
7/11/01 |
24/10/01 |
| 47 |
Read Bob Jone's "Sw release
planning" document and send comments via E-mail to the whole WP4
list. Source, closed |
All |
7/11/01 |
24/10/01 |
| 34 |
Find
new task leader for installation. Source,
closed |
Olof, Maite |
21/11/01 |
19/9/01 |
| 39 |
Gridification and Resource Mgmt to
produce a report on overlaps with Globus.Target for November 27 (Action
from Frascati meeting). Source, update-1,
update-2, closed |
Gridification task and Resource Management
task |
19/12/01 |
10/10/01 |
| 41 |
Follow up if Condor is needed for NIKHEF
testbed for release 1. Source, update-1,
update-2, closed |
David |
19/12/01 |
11/10/01 |
| 43 |
Fix information providers for Globus-2. Source,
update-1, closed |
Thomas, Florian |
19/12/01 |
11/10/01 |
| 49 |
Write
a
draft global specification for Release-2. Source,
update-1, closed |
Olof, German |
19/12/01 |
7/11/01 |
| 50 |
Review
available resources in the partner institutes for next year. Source,
closed |
Olof |
19/12/01 |
7/11/01 |
| 51 |
Initiate
and drive
the second iteration on the open issues in the architecture. Source,
update-1, closed |
German |
19/12/01 |
7/11/01 |
| 52 |
Provide
WP6 with SE, CE and Gatekeeper LCFG default configurations. Source,
closed |
Marco |
19/12/01 |
21/11/01 |
| 53 |
Answer
request from German for formal points that should be discussed on Monday.
Want feedback before Friday., Source,
closed |
All |
19/12/01 |
21/11/01 |
| 37 |
Thomas to fix a call-out
phone for next telephone conferences. Source
, update-1, closed |
Thomas |
09/01/02 |
19/9/01 |
| 55 |
Distribute DataGrid repository guidelines
& coding/naming conventions to WP4. Read and send comments to discuss
next phone-conference. Source, closed |
Maite, WP4 |
09/01/02 |
19/12/01 |
| 19 |
Find
out what motherboards (vendor, type, chip-set) are going to be used by the
testbeds. The FT task requests this information. Source,
update-1, update-2,
update-3, closed |
Frank, Lord |
06/02/02 |
15/5/01 |
| 56 |
Send a mail/written report about LCAS library
& modules needed by the new gateway, and if this release will rely on
gridmap files. Source, update-1,
update-2, closed |
David |
06/02/02 |
19/12/01 |
| 59 |
Arrange
a phone conference between monitoring and FT tasks next week. Source,
closed |
Olof |
06/02/02 |
23/01/02 |
| 62 |
Clarify
if te RMS job-manager for release 1.2 would work with a globus
gatekeeper of if it requires the WP4 gatekeeper. Source,
closed |
Thomas, Florian |
06/02/02 |
23/01/02 |
| 3 |
LCFG: decide on RPM list and send it to WP6. Source,
update-1, update-2,
update-3, update-4,
update-5, update-6,
closed |
Jan + Maite |
20/02/02 |
19/9/01 |
| 14 |
Consider
section 4.4.2, use-case by the gridification task on host authentication
at initial installation, in the architecture document circulated by German
before the workshop. Source,
update-1, update-2,
update-3, update-4,
closed |
Installation task (Phil) |
20/02/02 |
15/5/01 |
| 36 |
Clarify
together with Marco Serra (INFN Rome) what has been done for the
Globus-LCFG object (for Globus-2) and who works on it. Source,
update-1, update-2,
update-3, update-4,
update-5, update-6,
closed |
Maite |
20/02/02 |
19/9/01 |
| 42 |
Report experience with LCFG. Source,
update-1, update-2,
update-3, update-4,
closed |
All institutes using LCFG |
20/02/02 |
11/10/01 |
| 57 |
Send the plans & contents for future
Edinburgh LCFG releases to German/instqallation mailing list. Source,
update-1, closed |
Lex |
20/02/02 |
19/12/01 |
| 60 |
Read
WP1 proposal for accounting and determine what WP4 wants/can do for
release 2 and what could be discussed at a bi-lateral meeting with WP1 in
Paris in March. Thomas is main contact with WP1 in this matter. Source,
closed |
David, German, Thomas, Olof |
|
23/01/02 |
| 61 |
Investigate
risks with releasing the WP4 gatekeeper in release 1.2 and also
report/coordinate this work with the EDG authorization work. Source,
update-1, update-2,
closed |
David |
06/02/02 |
23/01/02 |
| 65 |
Put
gatekeeper code in CVS. Source,
closed |
Martijn |
14/03/02 |
05/03/02 |
| 67 |
Decide
if the RMS task is ready to release their first prototype job manager for
R1.2. Source,
closed |
Thomas |
20/03/02 |
05/03/02 |
| 63 |
Try
to achieve a WP4-wide decision on what RPC mechanism should be used for
new interfaces. All tasks must
investigate SOAP (or other XML RPC) implementation for the different
programming languages they intend to use. Florian agreed to collect the
input. Source, update-1,
update-2,
update-3, closed |
All task leaders |
|
06/02/02 |
| 66 |
Upgrade
of the FT CE interfaced with the Monitoring repository. Check with Sylvain
how to use the current interface and when to migrate to the new interface.
Source,
update-1,
update-2 , closed |
Lord |
20/03/02 |
05/03/02 |
| 68 |
Send
to Olof and Maite details of the work involved to port the WP4 software to
Solaris. The sort of information needed is what are the steps involved,
what knowledge of Solaris is required and how much time each task would
take. Source, update-1,
update-2, closed |
All task leaders |
04/04/02 |
20/03/02 |
| 70 |
Fill in gridification testplan
for release 1.2 (see mail
from Maite) closed |
David, Martijn |
17/04/02 |
|
| 48 |
Write
a draft Release 2 subsystem development plan. The plan should follow the
template circulated by Olof last week. Source,
update-1, update-2,
update-3, update-4,
update-5,
update-6, update-7,
update-8, closed |
Lionel, Florian, David, Lord, German |
29/05/02 |
7/11/01 |
| 54 |
Port CE information providers to Condor. Source,
update-1, update-2,
update-3,
update-4, update-5,
closed |
Florian, Thomas |
29/05/02 |
21/11/01 |
| 71 |
Follow-up
the edg license issue. Source, closed |
Maite, Olof |
29/05/02 |
08/05/02 |
| 64 |
Organise
the meeting with LCFG experts and Markus and Emanuele the week after the
Paris week. Source, update-1,
update-2, update-3,
update-4, closed |
Maite |
|
20/02/02 |
| 72 |
Summarise
the installation task autobuild issues in some detail for Yannick and
Maite. Source, closed |
German |
|
29/05/02 |
| 73 |
Check with Cal when he wants to
organize a meeting about the Globus gatekeeper and job manager
problems. Source, closed |
Maite |
|
29/05/02 |
| 75 |
Invite an LSF expert from CERN to
the WP4 workshop. Source, closed |
Olof |
19/06/02 |
29/05/02 |
| 69 |
All
task to comply with autobuild (see mail
from Maite) update-1, update-2,
update-3, update-4,
closed |
All tasks leaders |
17/04/02 |
31/05/02 |
| 77 |
Provide un updated version of the
FT preliminary design and development plan that matches the recent
progress reports. Source, closed |
Frank, Lord |
31/07/02 |
26/06/02 |
| 78 |
Inform Bob that LCFG released in
1.2 will not include the copyright line for release 1.3. Source,
closed |
Olof, Maite |
28/06/02 |
26/06/02 |
| 13 |
Provide written formal
requirements to the configuration task:
- Type
of data to be stored
- Type
of queries
- Use-cases
Source,
update-1, update-2,
update-3, update-4,
update-5, update-6,
update-7, update-8,
update-9, update-10,
update-11, closed |
Task leaders (Olof, Lord, German Florian, David) |
30/10/02 |
15/5/01 |
| 80 |
Fix failing installation step of
autobuild for the installation task. Source,
update-1, closed |
German |
30/10/02 |
11/09/02 |
| 76 |
Follow
up together with WP1 (Massimo) the definition of the glue-schema for the
CE. Deployment of the new schema is planned for release 1.4. Source,
update-1, update-2,
update-3, update-4,
update-5, update-6,
closed |
Thomas |
27/11/02 |
12/06/02 |
| 79 |
Follow up that WP6 takes on the
task of defining the RH7.2 distribution for EDG. Source,
update-1, update-2,
closed |
Olof |
27/11/02 |
11/09/02 |
| 84 |
Answer
Maite’s email about exercises for the WP4 hands-on workshop. Source,
update-1, closed |
Lord, Sylvain, German, Thomas,
Martijn, Lionel |
08/01/03 |
30/10/02 |
| 85 |
Check with
Francesco (WP1) if the WP4 accounting is needed for their EU review demo. Source,
closed |
Olof |
08/01/03 |
27/11/02 |
| 86 |
Provide
input for next quarterly report (4Q02) based on October and November (not
December!) by end of this week (29/11/02). Because of the early EU review
(4-5th of February 2003) the last Quarterly Report for 2002
will have to be delivered by beginning of December. Olof will send a
reminder to the WP4 mailing list. Source,
closed |
All institute representatives |
08/01/03 |
27/11/02 |
| 87 |
Provide
update for what has been done to address the reviewers’ comments from
the first EU review and the EDG reply, see mail.
The update has to be included in the 2002 annual report, which needs to be
delivered by first week of December. Source,
closed |
All task leaders: Lord, Olof, German, Thomas,
David, Lionel |
08/01/03 |
27/1102 |
| 81 |
Find out if it is possible to
define scheduling attributes for the local disk footprint with the Maui
scheduler. Source, update-1,
closed |
Thomas |
|
11/09/02 |
| 82 |
Review
and comment on the global schema. This should also include a review
of what parts of the global schema are of interest for the tasks. Send the
review and comments to Maite. Source,
update-1, update-2,
closed |
Lord, Sylvain, German, Thomas,
Martijn |
18/10/02 |
09/10/02 |
| 83 |
Provide planning for 2003. Source,
update-1, update-3,
closed |
Thomas, David |
1/12/02 |
30/10/02 |
| 58 |
Make sure that they have a common and viable
solution for the job repository/job manager for release 1.2. Source,
update-1,
update-2, update-3,
update-4, update-5,
update-6, update-7,
update-8, update-9,
update-10, update-11,
update-12,
update-13,
closed |
Gridification task & Resource Management
task |
Release 1.2 |
19/12/01 |
| 89 |
Inform if the
RMS to be deployed at J+22 will/will not provide accounting support.
closed |
Thomas |
05/03/03 |
26/02/03 |
| 40 |
Fabric Monitoring and Fault Tolerance to
define interfaces between the different components in the subsystem.
Deadline for November WP4 workshop (Action from Frascati meeting). Source,
update-1, update-2,
update-3, update-4,
update-5, update-6,
update-7,
update-8, update-9,
update-10, update-11,
update-12, update-13,
update-14, update-15,
update-16, update-17,
update-18, update-19,
update-20,
update-21,
update-22,
closed |
Fabric Monitoring task and Fault Tolerance
task |
31/01/02 |
10/10/01 |
| 74 |
Coordinate the gathering and
publication of accounting data. Publication of accounting data to the grid
is foreseen for release 2. Source, update-1,
update-2, update-3,
update-4, update-5,
update-6, update-7,
update-8,
update-9,
closed |
Thomas |
30/09/02 |
29/05/02 |
| 17 |
Make sure to be able to
distinguish between the two cases:
- Execution
of a job fails because of a problem with the node
- Job
execution fails because of the job
The resource
management system cannot rely entirely on the monitoring to detect that a
node is unusable. There will always be time-windows when something fails
and the monitoring detects it (sensors are launched at a certain time
frequency). Source,
update-1,
update-2,
Closed |
Resource mgmt task (Florian, Thomas) |
|
15/5/01 |
| 93 |
Store latest version of FT mw in
cvs, and make it work with autobuild (gcc
3.2.2 compiler). Closed |
Lord |
06/03 |
13/05/03 |
| 88 |
German will
produce a set of use cases for action 17 and Thomas will test them and make
a report explaining if they are solved or not for next WP4 conference.
Update-1,
update-2,
update-3,
update-4,
closed |
Thomas, German |
10/03/03 |
26/02/03 |
| 95 |
Switch on the RMS at their sites
once the release EDG2.0 is deployed so that it can be tested in a real
environment. Closed |
Andrea, David G. & Thomas |
06/03 |
13/05/03 |
| 94 |
Package external interfaces
separately according to developers’ guidelines.
Update-1,
update-2,
closed |
Piotr & task leaders |
06/03 |
13/05/03 |
| 92 |
Make WP4
components work with autobuild gcc3.2.2
Update-1, update-2,
update-3,
closed |
WP4 task leaders |
02/06/03 |
23/05/03 |
| 96 |
Follow up the
Fabric Monitoring use in the EDG testbed and promote it, e.g. release metric
to monitor daemons and wimple web interface to visualize it.
Source,
update-1,
update-2,
Closed |
Sylvain |
15/09/03 |
13/08/03 |
| 97 |
Contact WP3 to
check the status of the interfacing to the Fabric Monitoring.
Source,
update-1,
Closed |
Maite |
30/08/03 |
13/08/03 |
| 98 |
Prepare the 1h
tutorial topics and exercices for the EDG conference at Heidelberg and send
them to Maite. Source,
update-1,
update-2,
Closed |
Lord, Jan, Thomas and Martijn |
05/09/03 |
13/08/03 |
| 18 |
Investigate
and understand how to interface to LSF, PBS and Condor. Source,
update-1, update-2,
update-3, update-4,
update-5,
update-6, update-7,
update-8, update-9,
update-10,
update-11,
update-12,
update-13,
update-14,
update-15,
update-16,
Closed |
Resource mgmt task (Florian, Thomas) |
|
15/5/01 |
| |
|
|
|
|
|